A few of the many, written up.

Every project here ran on WeReno Capital, and these are a fraction of the thousands we have delivered. Ten years of this is what Handyman, Renobot and Opsonic were built out of.

A few of the many, written up

Hotels, restaurants, retail buildouts, public work and custom homes, out of thousands delivered over ten years. Almost none of them closed to do the work.

48projects written up here, out of thousands delivered.
$20Mthe largest single build in the set.
60+change orders on Embassy Grand. None of them moved the date.
5 floorsof Hampton Inn guest rooms, a floor a week, hotel open.
Case study

Turning a Rural Getaway into a Dream Home on a Tight Deadline

A rural property came half renovated, with open permits on it. See how WeReno Capital closed them out and made the house move-in ready inside three months.Read the case study
Case study

Revitalizing Turtle Jacks: A Flooring Makeover Without Closing

Turtle Jacks needed new flooring in a restaurant that never stops serving. See how pre-cut, dust-free installation ran on slow days with the doors still open.Read the case study
Case study

Lighting Up Safety: A Strategic Overhaul of a Police Facility’s Security and Visibility

A police facility needed better lighting and camera coverage across its parking areas. See how the work ran zone by zone, around shift changes, with no closure.Read the case study
Case study

Hampton Inn’s Modern Makeover: A Five-Floor PIP With the Hotel Open

Five floors of Hampton Inn guest rooms brought up to brand standard, a floor a week. See how the hotel PIP ran floor by floor without closing the hotel.Read the case study
Case study

Building Success: Managing a Holiday Inn Construction with Efficiency and Precision

A ground-up Holiday Inn hotel, foundation to finish, on a fixed budget. See how WeReno Capital ran the bids, permits and city approvals to IHG brand standards.Read the case study
Case study

Christian Dior: Designing a Display That Captivates and Converts

Dior needed a display that pulled shoppers across a busy Toronto retail floor. See how WeReno Capital took it from vision board to installed showcase in store.Read the case study
Case study

Three Months, $1.5 Million, and 60+ Change Orders: Transforming Embassy Grand Banquet Hall

Embassy Grand needed its entrance floors and bathrooms rebuilt in three months. See how 60+ change orders landed without moving the date or losing an event.Read the case study
Case study

Managing a Developer’s Vision for a $20M Custom Home Build

A developer wanted a custom home built to plan without losing days to it. See how WeReno Capital ran the bids, permits and milestones on one dashboard.Read the case study
Case study

Customizing Spaces: Delivering Four Unique Tenant Buildouts in a Health and Medical Building

Four tenants, four fit-outs, one new medical building, six months. See how WeReno Capital ran the permits, design and trades so every tenant moved in on time.Read the case study
Case study

Fitting Out Starbucks in Richmond Hill Without Moving the Opening Date

Starbucks had a signed lease and an opening date, and the two were not negotiable. Everything else — permit timing, long-lead millwork, the landlord’s rules about working hours in a…January 2023Read the case study
Case study

Koodo Mobile: A Buildout Run From One Record

The Koodo Mobile project in Toronto involved the trades you would expect and the coordination you would not: a landlord, a designer, a supplier schedule and an owner who had a…February 2023Read the case study
Case study

Keeping Adidas Trading While the Work Went On

Adidas in Toronto could not shut. The work had to happen around trading hours, in phases, with the site made safe and presentable before every…March 2023Read the case study
Case study

Fitting Out Golf Simulator in Brampton Without Moving the Opening Date

Golf Simulator had a signed lease and an opening date, and the two were not negotiable. Everything else — permit timing, long-lead millwork, the landlord’s rules about working hours…April 2023Read the case study
Case study

Clothing Store: A Buildout Run From One Record

The Clothing Store project in Caledon involved the trades you would expect and the coordination you would not: a landlord, a designer, a supplier schedule and an owner who had a…May 2023Read the case study
Case study

Keeping XSCAPE Mall of America Trading While the Work Went On

XSCAPE Mall of America in Bloomington could not shut. The work had to happen around trading hours, in phases, with the site made safe and presentable before every…June 2023Read the case study
Case study

Fitting Out OUTTAKES Cineplex in Toronto Without Moving the Opening Date

OUTTAKES Cineplex had a signed lease and an opening date, and the two were not negotiable. Everything else — permit timing, long-lead millwork, the landlord’s rules about working…July 2023Read the case study
Case study

Bite Beauty Lip Lab: A Buildout Run From One Record

The Bite Beauty Lip Lab project in Toronto involved the trades you would expect and the coordination you would not: a landlord, a designer, a supplier schedule and an owner who had a…July 2023Read the case study
Case study

Keeping YoYo's Yogurt Cafe Trading While the Work Went On

YoYo's Yogurt Cafe in Toronto could not shut. The work had to happen around trading hours, in phases, with the site made safe and presentable before every…August 2023Read the case study
Case study

Fitting Out Olympics Canada Eaton Pop-up in Toronto Without Moving the Opening Date

Olympics Canada Eaton Pop-up had a signed lease and an opening date, and the two were not negotiable. Everything else — permit timing, long-lead millwork, the landlord’s rules about…September 2023Read the case study
Case study

MOWI Seafood Pop-up: A Buildout Run From One Record

The MOWI Seafood Pop-up project in Toronto involved the trades you would expect and the coordination you would not: a landlord, a designer, a supplier schedule and an owner who had a…October 2023Read the case study
Case study

Keeping Valentino Trading While the Work Went On

Valentino in Toronto could not shut. The work had to happen around trading hours, in phases, with the site made safe and presentable before every…November 2023Read the case study
Case study

Fitting Out Shopping Plaza in Winnipeg Without Moving the Opening Date

Shopping Plaza had a signed lease and an opening date, and the two were not negotiable. Everything else — permit timing, long-lead millwork, the landlord’s rules about working hours…December 2023Read the case study
Case study

Professional Office Building: A Buildout Run From One Record

The Professional Office Building project in Brampton involved the trades you would expect and the coordination you would not: a landlord, a designer, a supplier schedule and an owner…January 2024Read the case study
Case study

Keeping Strip Mall Trading While the Work Went On

Strip Mall in Winnipeg could not shut. The work had to happen around trading hours, in phases, with the site made safe and presentable before every…February 2024Read the case study
Case study

A Brand-Standard Renovation at Hampton Inn by Hilton, Fort Erie, With the Hotel Open

Hampton Inn by Hilton in Fort Erie had a property improvement plan to meet and no appetite for closing to do it. Rooms out of service are rooms not sold, so the number of floors down…March 2024Read the case study
Case study

Holiday Inn (Celebration): Keeping a Live Hotel Sellable Through a Full Refresh

Refreshing Holiday Inn (Celebration) in Orlando meant working in a building full of paying guests. Corridors, lifts and public areas all had to stay usable, clean and quiet enough to…April 2024Read the case study
Case study

Maintenance and Improvement at Inn at Calypso Cay, Run as One Programme

Inn at Calypso Cay in Orlando had the usual split: a capital improvement plan on one side and day-to-day maintenance on the other, both wanting the same rooms and the same…May 2024Read the case study
Case study

A Brand-Standard Renovation at Holiday Inn Express & Suites, Halifax, With the Hotel Open

Holiday Inn Express & Suites in Halifax had a property improvement plan to meet and no appetite for closing to do it. Rooms out of service are rooms not sold, so the number of floors…June 2024Read the case study
Case study

Quality Inn (Anjou): Keeping a Live Hotel Sellable Through a Full Refresh

Refreshing Quality Inn (Anjou) in Anjou meant working in a building full of paying guests. Corridors, lifts and public areas all had to stay usable, clean and quiet enough to…July 2024Read the case study
Case study

Maintenance and Improvement at Holiday Inn (Naples), Run as One Programme

Holiday Inn (Naples) in Naples had the usual split: a capital improvement plan on one side and day-to-day maintenance on the other, both wanting the same rooms and the same…July 2024Read the case study
Case study

A Brand-Standard Renovation at Quality Inn (Regina), Regina, With the Hotel Open

Quality Inn (Regina) in Regina had a property improvement plan to meet and no appetite for closing to do it. Rooms out of service are rooms not sold, so the number of floors down at…August 2024Read the case study
Case study

Residence Inn by Marriot: Keeping a Live Hotel Sellable Through a Full Refresh

Refreshing Residence Inn by Marriot in Laval meant working in a building full of paying guests. Corridors, lifts and public areas all had to stay usable, clean and quiet enough to…September 2024Read the case study
Case study

Maintenance and Improvement at Travelodge, Run as One Programme

Travelodge in Edmonton had the usual split: a capital improvement plan on one side and day-to-day maintenance on the other, both wanting the same rooms and the same…October 2024Read the case study
Case study

A Brand-Standard Renovation at The Westin, Edmonton, With the Hotel Open

The Westin in Edmonton had a property improvement plan to meet and no appetite for closing to do it. Rooms out of service are rooms not sold, so the number of floors down at once was…November 2024Read the case study
Case study

Apartment Building in Brampton: Running a Build for the Owner, Not the Builder

The owners of Apartment Building were not in construction and had no interest in becoming project managers. They needed somebody reading the quotes, the changes and the invoices with…December 2024Read the case study
Case study

Land Reclamation, Alliston: Tendered Work With the File Kept Audit-Ready

Land Reclamation was public work, which means the scrutiny is part of the scope. A committee reads the file, the procurement rules are not advisory, and every number has to be…January 2025Read the case study
Case study

Delivering UAE Consulate to a Public Timetable

UAE Consulate in Toronto had milestones that existed on a public timetable rather than a construction one. Missing a reporting date was as serious as missing a…February 2025Read the case study
Case study

Lancome Paris Showcase: A Retail Showcase Built to a Date That Could Not Move

The Lancome Paris Showcase showcase had an opening date set by a campaign, not by a construction schedule. The floor was trading, the access windows were narrow, and the finish had to…March 2025Read the case study
Case study

Installing Dior Showcase (Montreal) Without Closing the Floor

Dior Showcase (Montreal) had to be installed inside a department store that kept trading. Access was overnight, deliveries were restricted, and the finished result had to look like it…April 2025Read the case study
Case study

Rogers Ignite TV: A Retail Showcase Built to a Date That Could Not Move

The Rogers Ignite TV showcase had an opening date set by a campaign, not by a construction schedule. The floor was trading, the access windows were narrow, and the finish had to meet…May 2025Read the case study
Case study

Installing Bud Light Platinum Without Closing the Floor

Bud Light Platinum had to be installed inside a department store that kept trading. Access was overnight, deliveries were restricted, and the finished result had to look like it had…June 2025Read the case study
Case study

Rogers Store: A Retail Showcase Built to a Date That Could Not Move

The Rogers Store showcase had an opening date set by a campaign, not by a construction schedule. The floor was trading, the access windows were narrow, and the finish had to meet a…June 2025Read the case study
Case study

Installing Dior Showcase (Art of Gifting) Without Closing the Floor

Dior Showcase (Art of Gifting) had to be installed inside a department store that kept trading. Access was overnight, deliveries were restricted, and the finished result had to look…July 2025Read the case study
Case study

Garrison Bespoke: A Retail Showcase Built to a Date That Could Not Move

The Garrison Bespoke showcase had an opening date set by a campaign, not by a construction schedule. The floor was trading, the access windows were narrow, and the finish had to meet…August 2025Read the case study
Case study

Installing Adidas Soccer Without Closing the Floor

Adidas Soccer had to be installed inside a department store that kept trading. Access was overnight, deliveries were restricted, and the finished result had to look like it had always…September 2025Read the case study
Case study

Dior Showcase (Ogilvy): A Retail Showcase Built to a Date That Could Not Move

The Dior Showcase (Ogilvy) showcase had an opening date set by a campaign, not by a construction schedule. The floor was trading, the access windows were narrow, and the finish had to…October 2025Read the case study
Case study

Installing Dior Showcase (Bay) Without Closing the Floor

Dior Showcase (Bay) had to be installed inside a department store that kept trading. Access was overnight, deliveries were restricted, and the finished result had to look like it had…November 2025Read the case study
Case study

Dior Showcase (Mtl): A Retail Showcase Built to a Date That Could Not Move

The Dior Showcase (Mtl) showcase had an opening date set by a campaign, not by a construction schedule. The floor was trading, the access windows were narrow, and the finish had to…December 2025Read the case study

The software was written for this work, not for a demo.

Ten years of it, and then the four agents came out of it.

Bring us your next project.

Tell us what you are building and which of these it looks like. We will tell you who runs it.