The challenge
Turtle Jacks, a busy local restaurant, faced worn, outdated carpets in some areas, with limited newer flooring elsewhere. Needing a seamless renovation, the challenge was heightened by strict safety standards prohibiting construction dust, making the process more complex.
Objective
The primary goal was to renovate the restaurant without disrupting service. The plan was to start by upgrading a small area with a new design pattern, followed by the removal of the remaining carpet and installation of new flooring, all completed during nighttime hours.
The strategy
We developed a strategy tailored to the restaurant’s needs and strict safety standards.
Design Process
The team measured each area precisely and pre-designed layouts to ensure a smooth workflow. All materials were secured and available before starting, preventing any interruptions due to shortages. This meticulous preparation allowed the project to proceed efficiently and without delays.
Communication
A dashboard kept the client updated on the timeline, materials, and execution plan. Flooring was pre-ordered, labeled, and pre-cut off-site to ensure quick, dust-free installation. The team coordinated with the owners to schedule work on slower days, minimizing disruption and waste.
Execution
The team worked on larger sections during slower days to minimize disruption, allowing adequate drying time. Some areas were temporarily closed, but enough seating remained. Completing a small section first generated customer interest and drew positive attention, minimizing noticeable disruption.
We were impressed with how WeReno’s service fit our requirements perfectly. It offered solid budget tracking and regular updates, making the project run smoothly. It was a great value and well worth the investment.
Franchisee and operator
Turtle Jacks
WeReno Capital ran this one. See how it runs a project like this.
Ready to build or renovate?
Tell us about the building and the date you need it open. We will tell you what we would put on it.
More case studies
Case studyThree Months, $1.5 Million, and 60+ Change Orders: Transforming Embassy Grand Banquet Hall
Embassy Grand needed its entrance floors and bathrooms rebuilt in three months. See how 60+ change orders landed without moving the date or losing an event.
Case studyCustomizing Spaces: Delivering Four Unique Tenant Buildouts in a Health and Medical Building
Four tenants, four fit-outs, one new medical building, six months. See how WeReno Capital ran the permits, design and trades so every tenant moved in on time.
Case studyHampton Inn’s Modern Makeover: A Five-Floor PIP With the Hotel Open
Five floors of Hampton Inn guest rooms brought up to brand standard, a floor a week. See how the hotel PIP ran floor by floor without closing the hotel.Tell us what you are running.
Capital is on live projects now and the three agents are in early access. Tell us about the job and a representative will be in touch shortly.