Field & Schedule
Keep the project moving.
One record for the whole project, the chasing done for you, and the calls that are genuinely yours brought to the top.
One project record
The whole project in one place.
- A quote arrives as a photo of a page. Filed against the trade that sent it.
- The budget decision lands in a Saturday voice note. Attached to the change it moves.
- Somebody asks three months later. You have the answer and the document it came from.
- Project
- Embassy Grand Renovation
- Workfronts
- A · West, B · Central, C · East
- Committed finish
- Jul 10, 2026
- Change orders
- 64 raised · 53 approved · 8 rejected · 3 open
- Dependencies
- 27 tracked · 23 driving today’s dates
- Last filed
- Revision C, flooring scope · email attachment
Coordination
The chasing happens without you.
Most of a rep’s week goes on asking three people the same question until one answers, then writing it down. Capital runs that loop and keeps the plan current.
| When | What Capital did | Decided by | Tools |
|---|---|---|---|
| Jun 1 | Carried revision C through all three workfront scopes the day it landed | Model run | get_documents → update_project |
| Jun 2 | Cleared the west tile contractor to mobilise on Workfront A once the flood test result was filed, so nobody waited a day for the go‑ahead | Model run | get_documents → manage_plan |
| Jun 2 | Caught an association AGM on the venue booking sheet and blocked noisy work around it, six weeks out | Model run | import_event_calendar → manage_plan |
| Jun 3 | Sent the daily owner brief · week 1, nothing waiting on you | Model run | whats_due → send_link |
| Jun 5 | Weekly executive summary to Jun 5 · 6 change orders raised, 4 approved | Platform rule | None |
| Jun 9 | WeReno Ops walked all three workfronts and signed off week 2 progress | Person | None |
The ledger
Two entries from the same ledger. Capital opened one on its own.
East ran 14 boxes short nine days before tile setting reached the critical path, and East is the lane with no float. West was holding 14 spare boxes of the replacement lot with nothing booked against them. Capital moved them that night instead of waiting on air freight from the mill, which would have taken the committed finish with it. The two lots do not shade‑match, so the 214 sq ft they cover comes to you as a decision rather than quietly disappearing into the job. Schedule kept, 0.6 of a day recovered, and the only thing on your desk is the shade.
A site rep pulled 22 sq ft of mosaic 6802-A off attic stock to finish a short cut run in the central washrooms. Moved by hand at the trailer, logged after the fact, and the stock count still matches the site.
One was moved by hand at the trailer. Capital opened the other in 12 seconds, before anyone on site had noticed.
Bring us a project.
Send us the drawings and the dates. We will walk you through how Capital would run it, on your workfronts.