WeReno Capital Commercial & Supply

Buy better. Catch changes earlier. Keep the budget honest.

Quotes that come back comparable line for line, variations caught the week they happen, invoices checked against what you agreed to pay.

Variations and invoices

Catch the change while it is still a conversation.

Scopes move and quantities creep. Capital reads every invoice and variation against the scope you approved and the rate you agreed.

Flagged “Drywall billed at a quantity above the approved scope.”
Flagged “A change order dated after the work was already done.”
Approved “Framing variation matches the rate in the subcontract, and the committed finish does not move.”

You hear about it the week it happens, not after you have paid it.

One month on one project

Most lines match the scope and keep moving.

From the product
Needs your call
4 lines
billed above the approved scope
Cleared to pay
31 lines
matched to scope and rate
“Four decisions this month. The other thirty-one moved without you.”
The Rolodex

40,000+ contractors. The shortlist that fits your job.

Contractors on the WeReno network, ready to be put to work, with the trades they cover, how to reach them and whether we have worked with them before.

From the product
Rolodex · 40,000+ firms on the network
Firm Trades Relationship Outreach
Kestrel Restoration Inc. Flooring · Cleaning · Water restoration Worked with us before Email and phone
Bramwell General Contracting General In the network Phone
Halden Trades Limited Not listed yet In the network Phone

People at WeReno do the reaching out. A scope goes by email, so a firm we only have a phone number for gets a call from us first.

On one hotel job the shortlist came to 39 vetted companies, 6 of them ready to take your scope the same afternoon. People at WeReno make the calls and push back on price. Capital writes the scope up and chases the answers.

What buying early bought

Sixteen weeks on the signed plan. Six weeks delivered.

Same hotel, two numbers: the programme the owner signed, and what the trades handed back.

Superseded plan
16 weeks
  • Jun 1 – Sep 18, 2026. 110 calendar days.
  • Three zones, one at a time.
  • Materials ordered as each zone started.
  • Superseded May 25, 2026. Still on file.
Delivered
6 weeks
  • Jun 1 – Jul 10, 2026. 40 calendar days.
  • Three crews in parallel, one committed finish.
  • Long lead items bought before the trades needed them.
  • All three zones handed back to the venue.
From the product
Workfronts · three trades, three zones, one committed finish
Earlier at the finish
70 days
Against the handover date this project was signed under
Venue events worked around
15
5 noise · 10 access · zero cancellations
Critical path
7 steps
All of them through the east zone, the lane with no float
The hotel
Never closed
The venue kept trading through all six weeks
Every date and figure on the screen comes straight from your project record, and moves as the trades report. What you are looking at is what they are working to.