The challenge
Strip Mall in Winnipeg could not shut. The work had to happen around trading hours, in phases, with the site made safe and presentable before every open.
That constraint changes the whole plan. Deliveries, noisy work and anything needing an inspection all have to land in a window measured in hours.
What we did
We broke the scope into phases that could each be finished and cleaned inside a single closure, and sequenced the trades so no phase depended on one that had not been signed off.
Every change was priced and approved before it was built, because a variation agreed on site at eight in the morning is a variation nobody can evidence later.
The outcome
The buildout finished without an unplanned closure. Strip Mall traded through the entire programme, and the final account matched the approvals on file.
More case studies
Case studyThree Months, $1.5 Million, and 60+ Change Orders: Transforming Embassy Grand Banquet Hall
Embassy Grand needed its entrance floors and bathrooms rebuilt in three months. See how 60+ change orders landed without moving the date or losing an event.
Case studyCustomizing Spaces: Delivering Four Unique Tenant Buildouts in a Health and Medical Building
Four tenants, four fit-outs, one new medical building, six months. See how WeReno Capital ran the permits, design and trades so every tenant moved in on time.
Case studyRevitalizing Turtle Jacks: A Flooring Makeover Without Closing
Turtle Jacks needed new flooring in a restaurant that never stops serving. See how pre-cut, dust-free installation ran on slow days with the doors still open.Tell us what you are running.
Capital is on live projects now and the three agents are in early access. Tell us about the job and a representative will be in touch shortly.