The challenge
Land Reclamation was public work, which means the scrutiny is part of the scope. A committee reads the file, the procurement rules are not advisory, and every number has to be traceable to the document it came from.
On a tendered job the reporting is not paperwork you do afterwards. It is a deliverable with its own deadlines.
What we did
WeReno ran the project on one record, so the reporting was a view of the job rather than a reconstruction of it. Commitments were recorded as they were made, not at month end.
Every change order carried its justification, its price and the approval that released it, in the order it happened.
The outcome
Land Reclamation was delivered with a file that answered the committee’s questions without a search. Every figure in the final report traced back to the row it came from.
More case studies
Case studyThree Months, $1.5 Million, and 60+ Change Orders: Transforming Embassy Grand Banquet Hall
Embassy Grand needed its entrance floors and bathrooms rebuilt in three months. See how 60+ change orders landed without moving the date or losing an event.
Case studyCustomizing Spaces: Delivering Four Unique Tenant Buildouts in a Health and Medical Building
Four tenants, four fit-outs, one new medical building, six months. See how WeReno Capital ran the permits, design and trades so every tenant moved in on time.
Case studyRevitalizing Turtle Jacks: A Flooring Makeover Without Closing
Turtle Jacks needed new flooring in a restaurant that never stops serving. See how pre-cut, dust-free installation ran on slow days with the doors still open.Tell us what you are running.
Capital is on live projects now and the three agents are in early access. Tell us about the job and a representative will be in touch shortly.