The challenge
Dior Showcase (Bay) had to be installed inside a department store that kept trading. Access was overnight, deliveries were restricted, and the finished result had to look like it had always been there.
Retail installation is unforgiving about tolerance. The display is the product, so the quality of the finish is the quality of the campaign.
What we did
Components were fabricated off site and staged so each night’s work was a known quantity, and the scope for every shift ended at a point the floor could open from.
Every variation was agreed in writing before it was built, because a change made at two in the morning is a change nobody can evidence at ten.
The outcome
Dior Showcase (Bay) was installed to schedule and to specification, with no trading time lost and no disagreement at the end about what had been agreed.
More case studies
Case studyThree Months, $1.5 Million, and 60+ Change Orders: Transforming Embassy Grand Banquet Hall
Embassy Grand needed its entrance floors and bathrooms rebuilt in three months. See how 60+ change orders landed without moving the date or losing an event.
Case studyCustomizing Spaces: Delivering Four Unique Tenant Buildouts in a Health and Medical Building
Four tenants, four fit-outs, one new medical building, six months. See how WeReno Capital ran the permits, design and trades so every tenant moved in on time.
Case studyRevitalizing Turtle Jacks: A Flooring Makeover Without Closing
Turtle Jacks needed new flooring in a restaurant that never stops serving. See how pre-cut, dust-free installation ran on slow days with the doors still open.Tell us what you are running.
Capital is on live projects now and the three agents are in early access. Tell us about the job and a representative will be in touch shortly.