Overview
The Brampton apartment building renovation required complete suite refresh across 48 occupied units — flooring, kitchen, bathroom, and fixture replacement — without triggering the tenant relocation obligations that would apply if suites were taken offline for more than a threshold period under Ontario residential tenancy law. The renovation had to be completed in active suites with tenants in residence, sequenced around tenant schedules and notice requirements.
The problem
The renovation had to be completed within the legally permitted disruption window per suite. Exceeding that window in any suite created a legal obligation to relocate the tenant — a cost and timeline exposure the owner wanted to avoid entirely. Standard suite renovation sequencing didn't account for per-suite time limits, and the GC's initial schedule had 12 suites exceeding the threshold.
Building Owner
"A multi-unit development has to deliver luxury finishes at a standard that attracts and retains premium tenants. The smart home integration was central to our positioning in the market."
The Solution
WeReno built a suite-level digital twin for all 48 units and integrated the Ontario tenancy disruption threshold as a hard constraint on the renovation sequence. Every suite's renovation window was validated against its threshold before the GC's schedule was approved. The twin tracked completion progress in real time — flagging any suite approaching its threshold limit before it became a legal obligation.
Building Owner
"WeReno premium finishes and smart home integration were exactly what was needed. The quality throughout set us apart in a competitive Brampton rental market."
The result
The Brampton apartment building renovation was completed across all 48 suites without a single tenant relocation obligation being triggered. The GC's schedule was adjusted four times using twin-derived threshold data. All suites were returned to tenants within the permitted disruption window. The full 48-unit renovation was completed in 11 weeks — two weeks ahead of the original schedule.
Building Owner
"WeReno delivered exceptional luxury in our multi-unit development. We reached 95% occupancy within three months of completion and have maintained premium rental rates throughout."