Marriott Hotels Toronto Flagship — $120M Renovation. One digital twin. Zero surprises.
- Company: Marriott Hotels – Toronto Flagship
- Industry: Hospitality / Commercial Construction
- Team Size: Construction team of 200+ across 14 subcontractors
- Headquarters: Toronto, ON
- Use case: BIM digital twin for phased hotel renovation with live operations
The results
Metric
Weekly coordination meetings
Guest incident rate (construction related)
Handover documentation prep
RFI resolution time
Before
3 per week
High
6 weeks
Avg. 4 days
After
1 per week
60% reduction
3 days
Avg. 18 hours
What our users say
"WeReno turned our renovation into a transparent, data-driven project. Our hotel GM and GC were finally looking at the same picture."
"We've done six major renovations. This was the first time we didn't have a punch list that dragged on for months. The twin made it impossible to hide incomplete items — and that's a good thing."
Sarah Pemberton
VP of Construction, Marriott Development
Key Features Used
- Real-time BIM digital twin with floor-by-floor construction progress
- Phased zone tracking with live active-construction overlays
- Punch list management linked directly to twin elements
- Structured FF&E and warranty data embedded at handover
- Role-based access for hotel GM, GC, and Marriott development team
See WeReno in action — live demo, no commitment.
Ready to run your next project with a live digital twin? Book a demo and we'll show you how it works on a model from your portfolio.
-
No credit card required
-
14-Day free trial