Metro Office Tower — $9.8M LEED Gold Commercial Build. Delivered 2 weeks early.
- Company: Private Corporation (name withheld)
- Industry: Commercial Real Estate / Office Development
- Team Size: Construction team across 12 subcontractors including MEP prime
- Location: Business District Central
- Use case: BIM digital twin for LEED Gold commercial construction with full MEP coordination and compliance traceability
The results
Metric
MEP coordination conflicts
LEED documentation prep time
Project schedule vs. baseline
Energy performance vs. model
Before
High — dense urban site constraints
Weeks of manual assembly
At risk
Modeled baseline
After
Resolved in twin before on-site
Auto-compiled from twin data
Delivered 2 weeks early
+20% better than modeled
What our users say
"WeReno approach to our office building modernization was exceptional. The building now attracts premium tenants and the enhanced technology systems have significantly improved our operational efficiency."
"WeReno's professional approach to our office building modernization was exceptional. Their enterprise-level project management provided tremendous value. The building now attracts premium tenants and the enhanced technology systems have significantly improved our operational efficiency."
Project Client
Office Building — Brampton, ON
Key Features Used
- Federated BIM twin with MEP coordination layer across all prime trades
- LEED documentation module — automated traceability from every subcontractor
- Clash detection surfaced in the twin before field installation
- Trade scheduling and progress analytics by system and floor
- Structured digital handover with as-built data and commissioning records
See WeReno in action — live demo, no commitment.
Ready to run your next project with a live digital twin? Book a demo and we'll show you how it works on a model from your portfolio.
-
No credit card required
-
14-Day free trial